W. Va. Code R. agency 64, tit. 64, ser. 64-19, app A

Current through Register Vol. XLI, No. 36, September 6, 2024
Appendix A - Permitting Fees

1. Construction /Installation Permits

A. Heat exchange wells: Permit Fee is determined by the ton rating of the heat pump machine. When more than one heat pump machine is hooked together, the cumulative total of the ton rating is used to determine the fee: One to fifty ton heat pump system $150; over fifty ton system $300.

Permitting fees for water well permits are located in the Bureau's rule, Fees for Permits, 64CSR30.

W. Va. Code R. agency 64, tit. 64, ser. 64-19, app A