Current through Register Vol. XLI, No. 45, November 8, 2024
Section 47-26-4 - Initial Permit Application Fees4.1. Fee Calculation. Except as provided in subsections 4.2 through 4.6 of this rule, all initial permit application fees shall be calculated through the use of the following formula: the initial permit application fee shall equal the volume fee multiplied by the facility factor multiplied by the waste factor (i.e., Initial Permit Application Fee = Volume Fee x Facility Factor x Waste Factor). 4.1.1. The appropriate volume fee will be determined through the use of the "New Facility" column of Table A of this rule.4.1.2. The appropriate facility factor will be determined through the use of Table B of this rule.4.1.3. The appropriate waste factor will be determined through the use of Table C of this rule.4.2. Publicly-Owned Treatment Works. The initial permit application fee for a POTW that operates a collection system only will be two thousand five hundred dollars ($2,500).4.3. Closed System Facilities. 4.3.1. The initial permit application fee for a closed system facility where priority pollutants or toxic chemicals are present in the system will be fifteen thousand dollars ($15,000).4.3.2. The initial permit application fee for a closed system facility where no priority pollutants or toxic chemicals are present in the system will be seven hundred dollars ($700).4.4. Solid Waste Facilities. The initial permit application fee for a solid waste facility will be set and collected in accordance with the provisions of 33CSR1.4.5. Minor Construction Activities. The initial permit fee for a minor construction activity requiring a permit will be three hundred dollars ($300).4.6. Concentrated Animal Feeding Operations (CAFOs). The initial permit application fee for a CAFO shall be fifty dollars ($50).