Current through Register Vol. XLI, No. 45, November 8, 2024
Section 42-23-5 - Inspection5.1. No bungee jumping site may be operated in this state without having first been inspected by the Division and certified safe for public use. Each site nay be inspected at any time during the permit period, but at no less interval than once in each twelve (12) months.5.2. The owner or operator shall, prior to construction or assembly, submit a report to the Division which contains the total site plans, safety zones, drawings and specifications of equipment and structures, and a copy of the site operating manual described in section fifteen of this rule.