Current through Register Vol. XLI, No. 44, November 1, 2024
Section 38-14-7 - Reporting Requirements7.1 Monthly Progress Reports During Construction - A written report containing results of inspection of construction progress shall be submitted by the owner every month. the report shall include but not be limited to a summary of instrumentation data, testing data, freeboard, crest elevation, water surface elevation, and specific construction problems. Upon completion of construction, notice shall be given to the Director of the Division of Oil and Gas of the Department of Energy.7.2 Post Construction Inspection Reports - A report shall be submitted by the owner reporting the findings of the inspection required in Section 6.2. Certification by an engineer shall be submitted with the inspection report that: (1) the dam and its appurtenances were constructed in general accordance with approved plans and specifications and(2) the dam and appurtenances are functioning as designed.7.3 Monthly Inspection Reports for Dams Under Construction with Serious Problems - A written report containing observations of the inspection required in Section 6.3 shall be submitted at least once per month.7.4 Emergency Procedures 7.4.1 Should a dangerous condition develop which is dangerous to human life, property, or the environment, the Director of the Division of Oil and Gas of the Department of Energy shall be informed immediately, The owner shall immediately take any remedial action necessary to protect life and property. Emergency procedures developed in accordance with Section 4.2 shall be implemented to protect life and property downstream. The site shall be inspected and monitored at least once every eight hours until the emergency situation is alleviated. Continuous monitoring may be required by the Director of Oil and Gas of the Department of Energy when there is an imminent danger to the health or safety of the public.7.4.2 Evaluation of Dangerous Conditions - If a dangerous condition develops, an engineering evaluation shall be initiated as soon as possible to formulate a plan for permanent correction of the dangerous condition. This evaluation and plan shall be submitted to and approved by the Division of Oil and Gas of the Department of Energy prior to implementation.