W. Va. Code R. § 38-4-27

Current through Register Vol. XLI, No. 37, September 13, 2024
Section 38-4-27 - Completion of Construction
27.1. Upon completion of the construction or modification of a dam, a joint inspection shall be conducted by the Secretary and the engineer. The purpose of inspection is to verify that all work has been accomplished in accordance with approved plan.
27.2. Acceptance of construction: When the dam owner is advised by the Secretary that construction appears satisfactory, the owner shall submit to the Secretary a certification by an engineer that all construction was in substantial conformance with the approved plans and specifications, including any modifications that have been approved by the Secretary. This certification shall be submitted within ninety (90) days of the Secretary's advisement. As-built drawings, including all variations from the original specifications and changes in location of borrow or waste disposal areas, shall be submitted with the engineer's certification. Upon the receipt of the engineer's certification with the as-built drawings, a letter of acceptance will be issued by the Secretary.

W. Va. Code R. § 38-4-27