W. Va. Code R. § 38-4-14

Current through Register Vol. XLI, No. 37, September 13, 2024
Section 38-4-14 - Storm Water Discharge
14.1. The sequence of construction work shall be planned to maximize the safe discharge of storm water while minimizing the amount of water retained in the impoundment. Either the principal spillway structures, including inlets and outlets, shall be operable prior to placement of construction material above the original valley elevation or diversion channels as required under 38CSR 2 Section 5.3 of WV Surface Mining Reclamation Rules will be in place.

W. Va. Code R. § 38-4-14