W. Va. Code R. § 36-7-9

Current through Register Vol. XLI, No. 43, October 25, 2024
Section 36-7-9 - Shortwall Mining - General Requirements
9.1. All hydraulic line repairs shall be performed in accordance with the requirements of the manufacturer's specifications.
9.2. All hydraulic roof support units and associated apparatus on a shortwall working face shall be visually inspected at least once during each coal production shift by a qualified person. A written record of such examination shall be maintained on the surface.

W. Va. Code R. § 36-7-9