R405.4 Calculation procedure. Calculations of the performance design shall be in accordance with Sections R405.4.1 and R405.4.2.
R405.4.1 General. Except as specified by this section, the standard reference design and proposed design shall be configured and analyzed using identical methods and techniques.
R405.4.2 Residence specifications. The standard reference design and proposed design shall be configured and analyzed as specified by Table R405.4.2(1). Table R405.4.2(1) shall include by reference all notes contained in Table R402.1.3.
Wash. Admin. Code § 51-11R-40540
Statutory Authority: RCW 19.27A.020, 19.27A.045 and chapters 19.27 and 34.05 RCW. 13-04-055, § 51-11R-40540, filed 2/1/13, effective 7/1/13.