Wash. Admin. Code § 480-140-040

Current through Register Vol. 24-21, November 1, 2024
Section 480-140-040 - What to file

Budgets, in a format selected by the reporting company, must show amounts needed for construction, operation and maintenance during the ensuing year. The reporting company must provide the information by industry (water, gas, and electrical to the extent such information has been prepared. All major construction projects must be identified in the budget. Major construction projects will be determined for water, gas, and electrical companies, as all projects where the Washington-allocated share of the total project is greater than five-tenths of one percent of the company's latest year-end Washington-allocated net utility plant in service, but does not include any project of less than three million dollars on a total project basis. This determination for companies providing combined industry services will be done on an industry-specific basis.

Wash. Admin. Code § 480-140-040

Amended by WSR 15-08-043, Filed 3/26/2015, effective 4/26/2015

Statutory Authority: RCW 80.04.160, 80.01.040 and 80.04.300 through 80.04.330. 99-23-065 (Order No. R-466, Docket No. A-990298), § 480-140-040, filed 11/15/99, effective 12/16/99. Statutory Authority: RCW 80.01.040. 92-02-083 (Order R-363, Docket No. U-911075), § 480-140-040, filed 12/31/91, effective 1/31/92; 91-08-026 (Order R-341, Docket No. U-901099), § 480-140-040, filed 3/28/91, effective 4/28/91. Statutory Authority: RCW 80.01.040 and 80.04.320. 87-01-001 (Order R-269, Cause No. U-86-121), § 480-140-040, filed 12/5/86. Statutory Authority: RCW 80.01.040 and 80.04.300 through 80.04.330. 83-06-016 (Order R-195, Cause No. U-83-02), § 480-140-040, filed 2/23/83; Order R-5, § 480-140-040, filed 6/6/69, effective 10/9/69.