The four priority elements that are common to all projects are as follows:
NASF of Category One | X | 10 points = X |
NASF of Category Two | X | 7 points = X |
NASF of Category Three | X | 4 points = X |
Then: The sum of X divided by the sum of NASF equals points.
Total Project Cost Up to $1,000,000 | Required Joint Funding 25% of total project cost | |
Between $1,000,000 and $2,000,000 | $275,000 | |
Between $2,000,000 and $3,000,000 | $300,000 | |
Between $3,000,000 and $4,000,000 | $325,000 | |
Between $4,000,000 and $5,000,000 | $350,000 | |
Between $5,000,000 and $6,000,000 | $375,000 | |
Between $6,000,000 and $7,000,000 | $400,000 | |
Between $7,000,000 and $8,000,000 | $425,000 | |
Between $8,000,000 and $9,000,000 | $450,000 | |
Between $9,000,000 and $10,000,000 | $475,000 | |
$10,000,000 and over | $500,000 |
Enrollment Percentage Increase Over Capacity | Priority Points | |
20 to above | 5 | |
16 to 19.9 | 4 | |
12 to 15.9 | 3 | |
8 to 11.9 | 2 | |
4 to 7.9 | 1 | |
Below 4 | 0 |
The scores for this group of elements will be determined after district compliance with the requirements of WAC 392-344-107.
Wash. Admin. Code § 392-343-505
Statutory Authority: RCW 28A.525.020. 10-09-008, § 392-343-505, filed 4/8/10, effective 5/9/10; 06-16-032, amended and recodified as § 392-343-505, filed 7/25/06, effective 8/25/06; 98-19-143, § 180-27-505, filed 9/23/98, effective 10/24/98. Statutory Authority: RCW 28A.525.020 and 1993 [1992] c 233 § 24(8)(e). 93-04-019, § 180-27-505, filed 1/26/93, effective 2/26/93. Statutory Authority: RCW 28A.525.020 and 1992 c 233 § 24(8). 92-16-058, § 180-27-505, filed 8/3/92, effective 9/3/92.