Affected employees must be notified by the employer or authorized/designated employee of the application and removal of lockout or tagout devices. Notification will be given before the controls are applied and after they are removed from the machine or equipment.
Note: | This section requires that the second notification take place before the machine or equipment is reenergized. |
Wash. Admin. Code § 296-45-17525
Statutory Authority: RCW 49.17.010, [49.17].040, [49.17].050 and [49.17].060. 98-07-009, § 296-45-17525, filed 3/6/98, effective 5/6/98.