Wash. Admin. Code § 296-155-20307

Current through Register Vol. 24-12, June 15, 2024
Section 296-155-20307 - Confined space work on sewer systems under construction

New systems under construction or new installations which have not yet been connected to a used system, may substitute forced ventilation for the testing requirements of chapter 296-809 WAC provided:

(1) Ventilation is effectively provided at least 5 minutes prior to entry into the confined space;
(2) Ventilation is provided, as required by WAC 296-62-13610, et seq., which supplies a continuous flow of air;
(3) Ventilation exhaust is discharged so as to present no hazard to other employees;
(4) An attendant is provided at the surface when there are employees in the manhole or pipe. The attendant must not leave the manhole unattended until such time as all employees are out and the cover has been replaced; and
(5) All other requirements for confined spaces are observed. See chapter 296-809 WAC.

Wash. Admin. Code § 296-155-20307

Amended by WSR 16-09-085, Filed 4/19/2016, effective 5/20/2016

Statutory Authority: Chapter 49.17 RCW. 94-15-096 (Order 94-07), § 296-155-20307, filed 7/20/94, effective 9/20/94. Statutory Authority: RCW 49.17.040 and 49.17.050. 86-03-074 (Order 86-14), § 296-155-20307, filed 1/21/86.