Design plans for conversion vendor units and medical units are required for units that are sold, leased, or used in Washington state and must be approved when:
(1) Conversion vendor units that contain one or more of the following components: (a) Concentrated loads exceeding five hundred pounds (see WAC 296-150V-0930);(b) Fuel gas piping systems and equipment;(c) Solid fuel burning equipment;(d) Fire suppression systems;(f) Electrical systems and equipment in excess of 30 amps/120 volts;(g) Electrical systems with more than five circuits;(h) Electrical systems incorporating photovoltaic energy, fuel cell energy, or other alternative energy systems;(i) Plumbing drainage systems conveying solid or bodily waste.(3) Modification of an approved design plan through addendums;(4) Addition of options to an approved design plan through addendums.Wash. Admin. Code § 296-150V-0300
Amended by WSR 16-13-119, Filed 6/21/2016, effective 6/21/2016Statutory Authority: Chapter 43.22 RCW. 99-18-069, § 296-150V-0300, filed 8/31/99, effective 10/1/99.