Wash. Admin. Code § 296-150V-0230

Current through Register Vol. 24-20, October 15, 2024
Section 296-150V-0230 - What are the insignia application requirements?
(1) If you are requesting insignia for conversion vendor units or medical units your completed application must include:
(a) A completed design plan approval request form when required by WAC 296-150V-0300;
(b) When required by WAC 296-150V-0300, one complete set of design plans, specifications, engineering analysis and test procedures and results (when applicable), plus one additional set for each manufacturing location where the design plan will be used;
(c) For medical units at least one set of design plans must have an original wet stamp from a professional engineer or architect licensed in Washington state. For conversion vendor units a professional engineer or architect stamp is only required on the structural load test or calculations required by WAC 296-150V-0930. We will retain the set with the original wet stamp; and
(d) A one-time initial filing fee, the design plan fee when required by WAC 296-150V-0300, and the fee for each insignia (see WAC 296-150V-3000) .
(2) If you are requesting insignia under an approved design plan, your completed application must include:
(a) A completed insignia application form; and
(b) The fee for each conversion vendor unit or medical unit insignia (see WAC 296-150V-3000) .

Wash. Admin. Code § 296-150V-0230

Amended by WSR 16-13-119, Filed 6/21/2016, effective 6/21/2016

Statutory Authority: Chapter 43.22 RCW. 99-18-069, § 296-150V-0230, filed 8/31/99, effective 10/1/99.