Wash. Admin. Code § 296-150F-0550

Current through Register Vol. 24-21, November 1, 2024
Section 296-150F-0550 - Do you notify the local enforcement agency after your final inspection of factory-built structures at a manufacturing location?

After we perform a final inspection of a factory-built, commercial structure, or component, we will send a notice to the local enforcement agency (NLEA) that:

(1) Specifies what connections, standards, and incomplete items the local enforcement agency must check when the unit is installed; and/or
(2) Estimates the expected time of arrival of the factory-built house or commercial structure to the site.

Wash. Admin. Code § 296-150F-0550

Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360, [43.22.]432, [43.22.]440 and [43.22.]480. 96-21-146, § 296-150F-0550, filed 10/23/96, effective 11/25/96.