For the purpose of the Washington state public works law, chapter 39.12 RCW, construction site surveyors perform survey work which requires the use or utilization of transits, tripod mounted levels, lasers, electrotape and other electronic measuring devices or theodolites to establish a location, an elevation or grade, distances, and other measurements.
* Survey work performed after the contract is awarded and during the actual construction in direct support of construction crews when the worker is in the employ of and working under the direction of a construction contractor to survey check points of location and grade on a construction site using a variety of measurement tools, instruments, and procedures.
Wash. Admin. Code § 296-127-01396
Statutory Authority: Chapter 39.12 RCW and RCW 43.22.270. 08-23-082, § 296-127-01396, filed 11/18/08, effective 1/1/09.