Section 246-272B-05400 - Post-construction documentation

Post-construction documents must include the following:

(1) A LOSS construction completion report prepared by the design engineer that:
(a) Is on a form provided by the department;
(b) States the LOSS was constructed in substantial accordance with the approved plans and specifications; and
(c) Notes changes from the approved plans and specifications, if any.
(2) LOSS record drawings, in electronic format acceptable to the department, that are scaled to clearly show all necessary information.
(3) The final management plan that meets the requirements of WAC 246-272B-04100.
(4) A final O&M manual for the installed LOSS that meets the requirements of WAC 246-272B-04200.