Section 246-272B-05000 - Installer qualifications and responsibilitiesThe installer shall:
(1) Be currently approved by the local health jurisdiction in the county where the LOSS is to be constructed.(2) Have the following experience: (a) Three or more years experience installing OSS; or(b) A record of successful completion of at least one similar installation, including a pressure distribution drainfield.(3) Maintain a copy of approved plans and specifications on-site during construction;(4) Follow the approved plans and specifications or obtain approval from the design engineer prior to making field changes;(5) Install sewage tanks approved by the department according to the provisions of chapter 246-272C WAC, On-site sewage system tanks;(6) Be on the site at all times during the excavation and construction of the LOSS;(7) Backfill and grade the site after construction to prevent surface water from accumulating over any LOSS component; and(8) Leave the drainfield lines uncovered until the drainfield passes the department's final inspection. Driplines may be covered prior to inspection.Wash. Admin. Code § 246-272B-05000
Statutory Authority: RCW 70.118B.020. 11-12-035, § 246-272B-05000, filed 5/25/11, effective 7/1/11.