For more general design, and construction requirements that pertain to all pools see WAC 246-260-031.
Factors for Determination of Spa Loading
Spa Volume | Turnover Time (options are 10, 20, 30, or *60 minutes) | Constant K10 (10 minute turnover time) 8 gpm/person | Constant K20+ (20, 30, or *60 minute turnover time) 6.67 gpm/person |
Value A | Value B | Value K10 | K20+ |
* | 60 minute turnover times are established for swim spa facilities. |
(Value A) | ||
/ | (Constant K*) = Maximum spa capacity | |
(Value B) |
* | Choose K based on turnover of the spa. |
Wash. Admin. Code § 246-260-051
Statutory Authority: Chapters 70.90 and 43.20 RCW. 04-18-096, § 246-260-051, filed 9/1/04, effective 10/31/04.