Current through Register Vol. 24-23, December 1, 2024
Section 246-359-090 - Issuing and maintaining a construction permit(1) The department of health will issue a construction permit when: (a) Construction documents are approved according to WAC 246-359-080; and(b) Permit and inspection fees are paid according to WAC 246-359-990.(2)Construction can begin after the applicant is issued a construction permit by the department of health;(3)The following conditions, at a minimum, must be met during construction:(a)The "inspection record card" must be posted in a visible location at the worksite and be readily accessible to the inspector at the worksite; and(b)The approved plans must be readily available to the inspector during all scheduled inspections.(4) The department of health will void the permit and the applicant's right to continue construction when: (a) The plans are changed, modified or altered without prior approval by the department of health as specified in WAC 246-359-080;(b)Any deviation in construction or design is made from the approved plans; and(c) The inspection record card and the approved plans are not readily and easily available to the inspector.Wash. Admin. Code § 246-359-090
Amended by WSR 15-13-091, Filed 6/15/2015, effective see belowStatutory Authority: RCW 70.114A.081. 99-03-065, § 246-359-090, filed 1/18/99, effective 2/18/99.