All construction by a public entity using board funds shall be done by advertisement, competitive bid and contract, except:
If federal funds are included in the project, the negotiated contract shall include the applicable provisions of federal highway administration policies and procedures prescribed in 23 C.F.R. 140, 23 C.F.R. 645 and 23 C.F.R. 646, Federal Aid Policy Guide.
Wash. Admin. Code § 226-16-010
Statutory Authority: Chapter 47.06A RCW. 99-18-048, § 226-16-010, filed 8/27/99, effective 9/27/99.