Except as provided in WAC 222-30-110, unit size and timing of timber harvesting by even-aged harvest methods is subject to the following requirements:
Evaluation of unit perimeters is subject to the conditions specified in subsection (6) of this section.
Wash. Admin. Code § 222-30-025
Statutory Authority: RCW 76.09.040. 05-12-119, § 222-30-025, filed 5/31/05, effective 7/1/05. Statutory Authority: Chapter 34.05 RCW, RCW 76.09.040, [76.09.]050,[76.09.]370, 76.13.120(9). 01-12-042, § 222-30-025, filed 5/30/01, effective 7/1/01. Statutory Authority: RCW 76.09.040, 76.09.050 and chapter 34.05 RCW. 92-15-011, § 222-30-025, filed 7/2/92, effective 8/2/92.