Wash. Admin. Code § 194-22-160

Current through Register Vol. 24-18, September 15, 2024
Section 194-22-160 - Scheduling curtailment

During periods of mandatory curtailment a consumer is obligated to provide the requisite amount of curtailment within each billing period. Within that billing period, and subject to equipment limitations and utility rules on load fluctuations, consumers are free to schedule their curtailment so as to minimize the economic cost, hardship, or inconvenience they experience as a result of the mandatory curtailment requirement.

Wash. Admin. Code § 194-22-160

Statutory Authority: RCW 43.21F.045. 94-20-103, § 194-22-160, filed 10/4/94, effective 11/4/94.