Wash. Admin. Code § 173-513-030

Current through Register Vol. 24-23, December 1, 2024
Section 173-513-030 - Establishment of instream flows
(1) Stream management units and associated control stations are established as follows:

Stream Management Unit Information

Control Station No.

Stream Management

Unit Name

Control Station Location,

River Mile and Section,

Township and Range

Affected Stream

Reach

12.0800-00

Deschutes River

3.4

Sec. 35-18N-2W

From the confluence of the Deschutes River with Capitol Lake upstream to the Deschutes Falls at river mile 41.

(2) Instream flows established for the stream management unit described in WAC 173-513-030(1) are as follows:

INSTREAM FLOWS IN THE DESCHUTES RIVER BASIN

(in Cubic Feet per Second)

Month

Day

USGS Gage

212-0800-00

Deschutes River

Jan.

1

400

15

400

Feb.

1

400

15

400

Mar.

1

400

15

400

Apr.

1

350

15

(Closed)

May

1

(Closed)

15

(Closed)

June

1

(Closed)

15

(Closed)

July

1

(Closed)

15

(Closed)

Aug.

1

(Closed)

15

(Closed)

Sept.

1

(Closed)

15

(Closed)

Oct.

1

(Closed)

15

(Closed)

Nov.

1

150

15

200

Dec.

1

300

15

400

(3) Instream flow hydrograph, as represented in the document entitled "Deschutes River basin instream resource protection program," shall be used for identification of instream flows on those days not specifically identified in WAC 173-513-030(2).

Wash. Admin. Code § 173-513-030

Statutory Authority: Chapters 90.22 and 90.54 RCW. 80-08-019 (Order DE 80-11), § 173-513-030, filed 6/24/80.