The pull date must first show the month then the day of the month. The month can either be identified with three letters indicating the month such as DEC for December or by numbers indicating the month from one for January through twelve for December. The day of the month must be shown using two numbers such as 06 for the sixth day or 19 for the nineteenth day. When both the month and day of the month are shown by numbers they must be separated by a space or dash. The pull date must be separated from other numbers or letters on the label so as to prevent confusion.
Wash. Admin. Code § 16-142-140
Statutory Authority: RCW 69.04.915. 99-13-048, § 16-142-140, filed 6/9/99, effective 7/10/99.