Each county engineer shall be responsible for all NBI inspections of all NBI bridges on the county road system in accordance with the National Bridge Inspection Standards (NBIS) as promulgated and periodically revised by the WSDOT local programs office. The county engineer shall ensure all inspection data is reported to the current Washington state bridge inventory system within 90 days of each inspection. It is highly recommended that each county engineer perform routine inspections of the short span bridges, drainage structures, and large culverts on the county road system.
Wash. Admin. Code § 136-20-030
Statutory Authority: Chapter 36.79 RCW. 99-01-021, § 136-20-030, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.78.070 and 36.79.060. 96-17-013, § 136-20-030, filed 8/12/96, effective 9/12/96. Statutory Authority: RCW 36.78.070. 91-21-136 (Order 83), § 136-20-030, filed 10/23/91, effective 11/23/91; 90-17-075 (Order 78), § 136-20-030, filed 8/16/90, effective 9/16/90. Statutory Authority: Chapter 36.78 RCW. 79-01-099 (Order 36), § 136-20-030, filed 1/3/79; Order 11, § 136-20-030, filed 10/9/69.