The adopted annual program shall include, but not be limited to:
When a project involves both contract and construction by county forces work the estimate shall be divided to show the estimated cost of each type of work. The sum of all construction costs shall be approximately equal to the amount included in the road fund construction budget for construction work. All construction projects shall be shown, regardless of funding source, including all projects previously authorized and under way on which expenditures are anticipated during the program year. Projects previously authorized on which construction work is contemplated within the program year shall also be listed showing the estimated costs of work during the program year. In all cases, the total amount of proposed construction by county forces costs shall not exceed the construction by county forces limit as computed in WAC 136-16-022.
Wash. Admin. Code § 136-16-020
Statutory Authority: Chapter 36.78 RCW. 09-23-044, § 136-16-020, filed 11/9/09, effective 12/10/09. Statutory Authority: RCW 36.78.070 and 36.79.060. 96-17-013, § 136-16-020, filed 8/12/96, effective 9/12/96. Statutory Authority: Chapter 36.78 RCW. 80-09-084 (Order 38), § 136-16-020, filed 7/22/80; Order 29, § 136-16-020, filed 8/3/76; Order 21, § 136-16-020, filed 4/19/73; Regulation 2, § 136-16-020, filed 12/13/67.