The priority programming process for roads shall be applied by the county engineer to all potential arterial, collector and bridge projects in the county, and to local access road projects if directed by the legislative authority. The resulting priority array(s) shall be updated not later than the first Monday in October and shall be consulted together with bridge priorities by the county legislative authority and county engineer during the preparation of the proposed six-year transportation program as described in chapter 136-15 WAC.
Wash. Admin. Code § 136-14-040
Statutory Authority: Chapter 36.79 RCW. 99-01-021, § 136-14-040, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.78.070 and 36.79.060. 96-17-013, § 136-14-040, filed 8/12/96, effective 9/12/96. Statutory Authority: RCW 36.78.070. 90-07-075 (Order 75), § 136-14-040, filed 3/21/90, effective 4/21/90; Order 25, § 136-14-040, filed 1/27/75; Order 3388, § 136-14-040, filed 4/7/72; Order 16, § 136-14-040, filed 7/22/71.