9 Va. Admin. Code § 5-40-1210

Current through Register Vol. 41, No. 6, November 4, 2024
Section 9VAC5-40-1210 - Definitions
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.

"Asphalt concrete plant" means any facility used to manufacture asphalt concrete by heating and drying aggregate and mixing with asphalt cements.

"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.

"Process unit" means any step in a manufacturing or process operation which results in emission of pollutants to the atmosphere.

"Process weight" means total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.

"Process weight rate" means a rate established as follows:

a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.

9 Va. Admin. Code § 5-40-1210

Derived from VR120-04-1002, eff. January 1, 1985.

Statutory Authority

§§ 10.1-1307 and 10.1-1308 of the Code of Virginia.