The technical criteria in Part II A and Part II B shall be implemented by a VSMP authority when a General Permit for Discharges of Stormwater from Construction Activities has been issued that incorporates such criteria. Until that time, the required technical criteria shall be found in Part II C. VSMPs adopted in accordance with the Act and this chapter shall become effective July 1, 2014, unless otherwise specified by the department.
9 Va. Admin. Code § 25-870-45
Statutory Authority: § 62.1-44.15:28 of the Code of Virginia; Chapters 68 and 758 of the 2016 Acts of Assembly.