9 Va. Admin. Code § 25-840-60

Current through Register Vol. 40, No. 22, June 17, 2024
Section 9VAC25-840-60 - [Repealed effective 7/1/2024] Maintenance and inspections
A. All erosion and sediment control structures and systems shall be maintained, inspected and repaired as needed to insure continued performance of their intended function. A statement describing the maintenance responsibilities of the permittee shall be included in the approved erosion and sediment control plan.
B. Periodic inspections are required on all projects by the VESCP authority. The VESCP authority shall either:
1. Provide for an inspection during or immediately following initial installation of erosion and sediment controls, at least once in every two-week period, within 48 hours following any runoff producing storm event, and at the completion of the project prior to the release of any performance bonds; or
2. Establish an alternative inspection program which ensures compliance with the approved erosion and sediment control plan. Any alternative inspection program shall be:
a. Approved by the department prior to implementation;
b. Established in writing;
c. Based on a system of priorities that, at a minimum, address the amount of disturbed project area, site conditions and stage of construction; and
d. Documented by inspection records.

9 Va. Admin. Code § 25-840-60

Derived From Virginia Register Volume 30, Issue 2, eff. October 23, 2013; Amended, Virginia Register Volume 39, Issue 4, eff. 11/9/2022; Repealed, Virginia Register Volume 40, Issue 8, eff. 7/1/2024.

Statutory Authority: § 62.1-44.15:28 of the Code of Virginia; Chapters 68 and 758 of the 2016 Acts of Assembly.