Current through Register Vol. 41, No. 6, November 4, 2024
Section 9VAC25-32-480 - Groundwater monitoring and reportingA. Monitoring wells may be required by the department for land treatment sites, sludge lagoons, biosolids land application sites, or biosolids storage facilities to monitor groundwater quality.B. If groundwater monitoring is required, a groundwater monitoring plan shall be submitted to the department for approval that includes at a minimum: 1. Geologic and hydrologic conditions at the site;2. Monitoring well design, placement, and construction;4. Sampling procedures, including quality assurance and quality control; and5. Collection of background samples.9 Va. Admin. Code § 25-32-480
Derived from Virginia Register Volume 24, Issue 6, eff. January 1, 2008, Errata, 25:15 VA.R. 2804 March 30, 2009; amended, Virginia Register Volume 29, Issue 24, September 1, 2013; Amended, Virginia Register Volume 39, Issue 5, eff. 11/23/2022.Statutory Authority: § 62.1-44.15 of the Code of Virginia.