Current through Register Vol. 41, No. 9, December 16, 2024
Section 9VAC25-193-50 - Authorization to dischargeA. Any owner governed by this general permit is hereby authorized to discharge process water, stormwater associated with this industrial activity, or commingled discharges of these types to surface waters of the Commonwealth of Virginia provided that: 1. The owner submits a registration statement in accordance with 9VAC25-193-60, and that registration statement is accepted by the department;2. The owner submits the required permit fee;3. The owner complies with the applicable effluent limitations and other requirements of 9VAC25-193-70; and4. The department has not notified the owner that the discharge is not eligible for coverage in accordance with subsection B of this section.B. The department will notify an owner that the discharge is not eligible for coverage under this general permit in the event of any of the following: 1. The owner is required to obtain an individual permit in accordance with 9VAC25-31-170 B 3;2. The owner is proposing to discharge to state waters specifically named in other board regulations that prohibit such discharges;3. The discharge would violate the antidegradation policy in the Water Quality Standards at 9VAC25-260-30; or4. The discharge is not consistent with the assumptions and requirements of an applicable TMDL approved prior to the term of this general permit.C. Compliance with this general permit constitutes compliance, for purposes of enforcement, with §§ 301, 302, 306, 307, 318, 403, and 405(a) through 405(b) of the federal Clean Water Act (33 USC § 1251 et seq.) and the State Water Control Law, with the exceptions stated in 9VAC25-31-60. Approval for coverage under this general permit does not relieve any owner of the responsibility to comply with any other applicable federal, state, or local statute, ordinance, or regulation.D. Continuation of permit coverage.1. Permit coverage shall expire at the end of its term. However, expiring permit coverages are automatically continued if the owner has submitted a complete registration statement at least 60 days prior to the expiration date of the permit, or a later submittal established by the department, which cannot extend beyond the expiration date of the permit. The permittee is authorized to continue to discharge until such time as the department either: a. Issues coverage to the owner under this general permit; orb. Notifies the owner that the discharge is not eligible for coverage under this general permit.2. When the owner that was covered under the expiring or expired general permit has violated or is violating the conditions of that permit, the department may choose to do any or all of the following:a. Initiate enforcement action based upon the general permit coverage that has been continued;b. Issue a notice of intent to deny coverage under the reissued general permit. If the general permit coverage is denied, the owner would then be required to cease the discharges authorized by the continued general permit coverage or be subject to enforcement action for discharging without a permit;c. Issue an individual permit with appropriate conditions; ord. Take other actions authorized by the VPDES Permit Regulation (9VAC25-31).9 Va. Admin. Code § 25-193-50
Derived from Virginia Register Volume 14, Issue 24, eff. October 1, 1998; amended, Virginia Register Volume 19, Issue 23, eff. October 1, 2003; Volume 22, Issue 9, eff. February 8, 2006; Volume 29, Issue 16, eff. October 1, 2013; Amended, Virginia Register Volume 35, Issue 05, eff. 1/1/2019; Amended, Virginia Register Volume 40, Issue 1, eff. 1/1/2024.Statutory Authority: § 62.1-44.15 of the Code of Virginia, 40 CFR, § 42 of the Clean Water Act, Parts 122, 123, and 124.