The owner or owner's agent shall submit two complete sets of construction documents, one full size, one half size, plus one set of full-size architectural drawings to the reviewing authority, Department of Corrections, Compliance, Certification, and Accreditation Unit as specified in this section.
1. Complete sets of construction documents shall consist of:a. Construction documents (at least 95% complete).d. Construction schedule.2. Review approvals from local building, health, and fire officials.3. The reviewing authority shall review construction documents for compliance with this chapter, building and fire code requirements, and incorporation of all changes required by the reviewing authority at the design development document review stage. a. Changes to the construction documents may be required. All required changes and recommendations shall be submitted in writing to the owner or owner's agent.b. The owner or owner's agent shall respond to all comments in the construction document review in writing to the reviewing authority. All issues in question between the owner or owner's agent and the reviewing authority shall be resolved before the project is bid.4. Upon satisfactory resolution of all review comments, construction documents shall be approved by the reviewing authority, and the owner shall be advised in writing.5. The approved plans shall not be construed as authority to omit or amend any of the provisions of this chapter except when a modification is granted by the board.6 Va. Admin. Code § 15-81-400
Derived From Virginia Register Volume 34, Issue 12, eff. 3/8/2018.Statutory Authority: 53.1-5, 53.1-80, and 53.1-82 of the Code of Virginia.