4 Va. Admin. Code § 25-150-100

Current through Register Vol. 41, No. 8, December 2, 2024
Section 4VAC25-150-100 - Operations plans
A. Each application for a permit or permit modification shall include an operations plan, in a format approved by or on a form prescribed by the director. The operations plan and accompanying maps or drawings shall become part of the terms and conditions of any permit which is issued.
B. The operations plan shall describe the specifications for the use of centralizers to ensure casing is centered in the hole. The specifications shall include, at a minimum, one centralizer within 50 feet of the water protection string seat and then in intervals no greater than every 150 feet above the first centralizer and are subject to the approval of the director.
C. The applicant shall indicate how risks to the public safety or to the site and adjacent lands are to be managed, consistent with the requirements of § 45.2-1629 B of the Code of Virginia, and shall provide a short narrative, if pertinent. The operations plan shall identify red zone areas.

4 Va. Admin. Code § 25-150-100

Derived from VR480-05-22.1 §1.10, eff. September 25, 1991; amended, Virginia Register Volume 15, Issue 2, eff. November 11, 1998; Volume 29, Issue 3, eff. November 8, 2012; Volume 30, Issue 1, eff. October 10, 2013; Amended, Virginia Register Volume 33, Issue 07, eff. 12/28/2016; Amended, Virginia Register Volume 38, Issue 13, eff. 3/31/2022.

Statutory Authority: § 45.2-103 of the Code of Virginia.