At least six months prior to mining, or within that period if approved by the division, the permittee shall mail a notification to all owners and occupants of surface property and structures above the underground workings. The notification shall include, at a minimum, identification of specific areas in which mining will take place, dates that specific areas will be undermined, and the location or locations where the permittee's subsidence control plan may be examined.
4 Va. Admin. Code § 25-130-817.122
Statutory Authority
§§ 45.1-161.3 and 45.1-230 of the Code of Virginia.