Each applicant for a surface coal mining and reclamation permit shall submit a description, plans, and drawings for each support facility to be constructed, used, or maintained within the proposed permit area. The plans and drawings shall include a map, appropriate cross sections, design drawings, and specifications sufficient to demonstrate compliance with 4VAC25-130-816.181 for each facility.
4 Va. Admin. Code § 25-130-780.38
Statutory Authority
§§ 45.1-161.3 and 45.1-230 of the Code of Virginia.