When an agreement is required between the local governing body and the department as a prerequisite to the acceptance of a street, nothing in these requirements shall preclude the local governing body from entering into separate agreements with other entities to fulfill its responsibilities. However, if the provisions are intended to ensure the safety of the public using the street, the department reserves the right to approve the involvement of the other party or parties.
All streets functionally classified as local shall have a design speed equal to the posted speed limit, except for streets functionally classified as local with a projected traffic volume of 400 vehicles per day or less, which may have a design speed less than the posted speed limit.
The department, locality, and developer shall take measures to minimize the impacts of through traffic on streets functionally classified as local and accepted into the secondary system of state highways under these regulations. Such measures shall include initial street designs that manage motor vehicle speed to match local context.
Street design that anticipates limited or no on-street parking shall be approved when sufficient off-street parking is provided in accordance with this chapter. Street design that anticipates the restriction of on-street parking on one side of the street shall be approved when sufficient off-street parking is provided for buildings on the side of the street where it is anticipated parking will be restricted.
For circular turnarounds, a well-defined, identifiable street segment, equal to the normal lot width along the intersected street that serves the cul-de-sac, or 50 feet, whichever is greater, shall extend from the intersected street to the turning area.
Such permits will clearly specify the responsibility for maintenance of the facility and related activities to the extent the facility occupies the street's right-of-way. The permit applicant should be an entity that can be reasonably expected to have perpetual maintenance capability.
The department will accept grade separation structures as part of new streets, provided the structure is a drainage structure or is intended to separate the movement of registered motor vehicles. In addition, the department will accept grade separation structures intended to separate pedestrians or bicyclists or any combination thereof from traffic using the roadway, provided:
In all other instances, the grade separation structure shall be deemed to be a locally controlled grade separation structure within the right-of-way of the street, in which case the street will only be accepted as part of the secondary system of state highways maintained by the department after the local governing body and the department have executed an agreement acceptable to the department that (i) acknowledges the department has no responsibility or liability due to the presence of the structure and (ii) assures the burden and costs of inspection, maintenance, and future improvements to the structure are provided from sources other than those administered by the department.
In all cases, whether the structure is accepted as an integral part of the roadway for maintenance by the department or it remains a locally controlled structure, the lighting, safety, and security of those using such facilities shall remain a responsibility of local government.
Stormwater management controls for VDOT projects are to be designed in accordance with the approved VDOT Erosion and Sediment Control and Stormwater Management Program Standards and Specifications, 2010, as annually approved by the State Water Control Board, the Erosion and Sediment Control Regulations (9VAC25-840), and the Virginia Stormwater Management Program (VSMP) Permit Regulation (9VAC25-870), and, if applicable, VDOT's MS4 Program Plan, 2008. While these controls may be necessary whenever a street maintained by the department is widened or relocated, the department does not require them in the development of new streets because such activity is regulated by the local governments. However, developers and counties may find these controls useful in managing land development activity.
Generally devices and treatments intended to mitigate the impact of stormwater shall be placed off of the right-of-way and shall be designed to prevent the backup of water against the roadbed. However, such devices and treatments may be placed within the right-of-way if the department and the local governing body have executed an agreement that (i) acknowledges the department has no responsibility or liability due to the presence of the devices or treatments, or both; (ii) assures the burden and costs of inspection, maintenance, VSMP permit requirements, TMDL WLA requirements, retrofitting or other future improvements to the devices and treatments, or other costs related to the placement of such devices or treatments within the right-of-way are provided from sources other than those administered by the department; (iii) a professional engineer licensed by the Commonwealth or the manufacturer as required by the department, certifies the construction of the facility to plans reviewed by the department; and (iv) design requirements of the facility are included in the department's Drainage Manual, 2002, the Department of Conservation and Recreation's Stormwater Management Handbook, First Edition, 1999, or supplemental directives.
Where development activity results in increased runoff to the extent that adjustment of an outfall facility is required, such adjustment shall be at the developer's expense and shall be contained within an appropriate easement.
The department is required to implement the Municipal Separate Storm Sewer System (MS4) permit for facilities located on its right-of-way. To comply with these requirements, the local governing body shall provide to the district administrator's designee all aspects of a proposed development's storm sewer system and associated stormwater management plan that are pertinent to the locality's or the department's MS4 permit. Additionally, the local governing body shall provide to the district administrator's designee an inventory of all outfalls to waters of the United States, physical interconnections with other stormwater systems, stormwater management devices, or both related to the project that are located within VDOT right-of-way as a condition of street acceptance in accordance with the VDOT MS4 Stormwater Outfall Inventory Manual, 2011. VDOT shall not accept a street for maintenance as part of the secondary system of state highways that are not in compliance with conditions of the pertinent MS4 permit and VDOT's MS4 Program Plan, 2008, as such conditions existed at the time of the relevant street construction plan's approval. VDOT shall not accept a street for maintenance if there is an illicit discharge to the system, as defined by 9VAC25-870-10 until the illicit discharge is eliminated.
Manholes shall not be placed in sidewalk, multiuse trail, or shared use path facilities, within five feet of curb ramps or within driveway entrances.
When location of the utilities outside of the pavement area is not practical such as in high density developments incorporating the principles of new urbanism as described in § 15.2-2223.1 of the Code of Virginia, such installations:
In the event it is necessary to open the street pavement to work on utilities after the surface has been placed, additional compaction tests and paving as necessary to restore the integrity and appearance of the roadway may be required at the discretion of the district administrator's designee.
To assure the unencumbered dedication of the right-of-way for street additions, easements or other interests within the platted right-of-way shall be quitclaimed of any prior rights therein. In exchange, a permit may be issued by the department for a utility to occupy the area involved. This permit will be processed by the district administrator's designee upon acceptance of the street into the secondary system of state highways maintained by the department. No fee is required for permits so issued. However, the approval of the permit shall be contingent upon the utility's compliance with applicable provisions of the Land Use Permit Regulations (24VAC30-151).
24 Va. Admin. Code § 30-92-120
Statutory Authority: § 33.2-210 of the Code of Virginia.
The amended version of this section by Virginia Register Volume 40, Issue 19, eff. 5/6/2024 is not yet available.