A permit is required for facilities relocated in conjunction with a VDOT project. For specific information, see the Right-of-Way Utilities Relocation Policies and Procedures Manual (see 24VAC30-151-760) . Utilities may be placed within the highway right-of-way by permit, including adjustments and work performed in connection with utilities agreements. Utilities placed within the right-of-way shall conform to the requirements of this chapter.
24 Va. Admin. Code § 30-151-400
Statutory Authority
§ 33.1-12 of the Code of Virginia.