An insurer may request a series of scheduled rate increases that are actuarially equivalent to a single amount requested over the lifetime of the policy. The entire series may be approved at one time as part of the current rate increase filing. The insurer shall be required to include contingent benefit upon lapse at the time of each scheduled increase.
The insurer may request a premium rate schedule increase less than what is required under this section and the commission may approve such premium rate schedule increase, without submission of the certification in subdivision 2 a of this subsection, if the actuarial memorandum discloses the premium rate schedule increase necessary to make such certification required, the premium rate schedule increase filing satisfies all other requirements of this section, and is, in the opinion of the commission, in the best interest of policyholders.
It is to be expected that the actual experience will not exactly match the insurer's projections. During the period that projections are monitored as described in subsections D and E of this section, the commission should determine that there is not an adequate match if the differences in earned premiums and incurred claims are not in the same direction (both actual values higher or lower than projections) or the difference as a percentage of the projected is not of the same order.
14 Va. Admin. Code § 5-200-153
Statutory Authority: §§ 12.1-13, 38.2-223, and 38.2-5202 of the Code of Virginia.