Current through Register Vol. 41, No. 10, December 30, 2024
Section 12VAC5-635-150 - Requirement for an easementA. If a rainwater harvesting system or a portion of the rainwater harvesting system is proposed to be installed on property other than the owner's, the owner must obtain an easement in perpetuity of sufficient area to permit access to install, maintain, and operate the rainwater harvesting system components from the appropriate property owner and record the easement with the clerk of the circuit court before issuance of a construction permit.B. The owner shall submit legal documentation of recordation of the easement or a signed statement that the easement will be recorded within 45 calendar days to the appropriate local health department with the application for a construction permit.C. If the owner does not obtain, properly record, and submit documentation of the easement, the owner may not install or operate the rainwater harvesting system on the property for which the easement was denied.12 Va. Admin. Code § 5-635-150
Derived from Virginia Register Volume 41, Issue 05, eff. 11/20/2024.Statutory Authority: §§ 32.1-12 and 32.1-248.2 of the Code of Virginia.