12 Va. Admin. Code § 5-620-70

Current through Register Vol. 41, No. 8, December 2, 2024
Section 12VAC5-620-70 - Establishing fees
A. The commissioner shall establish a schedule of fees to be charged by the department for services related to construction, maintenance, and repair or replacement of onsite sewage disposal systems, alternative discharge systems, and private wells and for appeals before the Review Board.
B. In establishing fees, the commissioner shall consider the actual or estimated average cost to the agency of delivering each service included in the schedule of fees.

The following fee schedule is hereby established:

SCHEDULE OF FEES

Application or Service

Fee

Certification letter, no onsite soil evaluator/professional engineer (OSE/PE) documentation (no charge for well)

$350

Certification letter with OSE/PE documentation, <=1,000 gpd

$320

Certification letter with OSE/PE documentation, >1,000 gpd

$1,400

Construction permit for treatment works only, no OSE/PE documentation

$425

Combined well and treatment works construction permit, no OSE/PE documentation

$725

Combined well and treatment works construction permit with OSE/PE documentation, <=1,000 gpd

$525

Construction permit for treatment works only with OSE/PE documentation, <=1,000 gpd

$225

Construction permit for treatment works only with OSE/PE documentation, >1,000 gpd

$1,400

Combined well and treatment works construction permit with OSE/PE documentation, >1,000 gpd

$1,700

Private well construction or abandonment permit, with or without OSE/PE documentation

$300

Closed-loop geothermal well system (one fee per well system)

$300

Alternative discharge system inspection fee

$75

Minor modification to an existing system

$100

Appeal before the Review Board

$135

12 Va. Admin. Code § 5-620-70

Derived from VR355-34-03 §3.1, eff. July 1, 1989; Amended, Virginia Register Volume 32, Issue 10, eff. 2/12/2016.

Statutory Authority: §§ 32.1-12, 32.1-164, and 32.1-176.4 of the Code of Virginia.