12 Va. Admin. Code § 5-610-950

Current through Register Vol. 40, No. 22, June 17, 2024
Section 12VAC5-610-950 - Absorption area design
A. The absorption area is the undisturbed soil medium utilized for absorption of the effluent. The absorption area includes the infiltrative surface in the absorption trench and the soil between and around the trenches when trenches are used.
B. Suitability of soil horizon. The absorption trench bottom shall be placed in the soil horizon or horizons with an average estimated or measured percolation rate less than 120 minutes per inch. Soil horizons are to be identified in accordance with 12VAC5-610-480. The soil horizon must meet the following minimum conditions:
1. It shall have an estimated or measured percolation rate equal to or less than 120 minutes per inch;
2. The soil horizon or horizons shall be of sufficient thickness so that at least 12 inches of absorption trench sidewall is exposed to act as an infiltrative surface; and
3. If no single horizon meets the conditions in subdivision 2 of this subsection, a combination of adjacent horizons may be utilized to provide the required 12-inch sidewall infiltrative surface. However, no horizon utilized shall have an estimated or measured percolation rate greater than 120 minutes/inch.
C. Placement of absorption trenches below soil restrictions. Placement of the soil absorption trench bottom below soil restrictions as defined in 12VAC5-610-490 D, whether or not there is evidence of a perched water table as indicated by free standing water or redoximorphic features, including concentrations, depletions, or stains, nodules, or concretions of iron and manganese, requires a special design based on the following criteria:
1. The soil horizon into which the absorption trench bottom is placed shall be a Texture Group I, II, or III soil or have an estimated or measured percolation rate of less than 91 minutes per inch.
2. The soil horizon shall be a minimum of three feet thick and shall exhibit no characteristics that indicate wetness on restriction of water movement. The absorption trench bottom shall be placed so that at least two feet of the soil horizon separates the trench bottom from the water table or rock. At least one foot of the absorption trench side wall shall penetrate the soil horizon.
3. A lateral ground water movement interceptor (LGMI) shall be placed upslope of the absorption area. The LGMI shall be placed perpendicular to the general slope of the land. The invert of the LGMI shall extend into, but not through, the restriction and shall extend for a distance of 10 feet on both sides of the absorption area (See 12VAC5-610-700 D 3).
4. Pits shall be constructed to facilitate soil evaluations as necessary.
D. Sizing of absorption trench area for septic tank effluent.
1. Required area. The total absorption trench bottom area required shall be based on the average estimated or measured percolation rate for the soil horizon or horizons into which the absorption trench is to be placed. If more than one soil horizon is utilized to meet the sidewall infiltrative surface required in subsection B of this section, the absorption trench bottom area shall be based on the average estimated or measured percolation rate of the "slowest" horizon. The trench bottom area required in square feet per 100 gallons (Ft2/100 Gals) of sewage applied for various soil percolation rates is tabulated in Table 5.4. The area requirements are based on the equation:

log y = 2.00 + 0.008 (x)

where y = Ft2/100 Gals

x = Percolation rate in minutes/inch

Notwithstanding the above, the minimum absorption area for single family residential dwellings shall be 400 square feet.

2. Area reduction. See Table 5.4 for area reduction when gravelless material or low pressure distribution is utilized. A reduction in area shall not be permitted when flow diversion is utilized with low pressure distribution. When gravelless material is utilized, the design width of the trench shall be used to calculate minimum area requirements for absorption trenches.
E. Minimum cross section dimensions for absorption trenches.
1. Depth. The minimum trench sidewall depth as measured from the surface of the mineral soil shall be 12 inches when placed in a landscape with a slope less than 10%. The installation depth shall be measured on the downhill side of the absorption trench. When the installation depth is less than 18 inches, the depth shall be measured from the lowest elevation in the microtopography. All systems shall be provided with at least 12 inches of cover to prevent frost penetration and provide physical protection to the absorption trench; however, this requirement for additional cover shall not apply to systems installed on slopes of 30% or greater. Where additional soil cover must be provided to meet this minimum, it must be added prior to construction of the absorption field, and it must be crowned to provide positive drainage away from the absorption field. The minimum trench depth shall be increased by at least five inches for every 10% increase in slope. Sidewall depth is measured from the ground surface on the downhill side of the trench.
2. Width. All absorption trenches utilized with gravity distribution shall have a width of from 18 inches to 36 inches. All absorption trenches utilized with low pressure distribution shall have a width of eight inches to 24 inches.
F. Lateral separation of absorption trenches. The absorption trenches shall be separated by a center to center distance no less than three times the width of the trench for slopes up to 10%. However, where trench bottoms are two feet or more above rock, pans, and impervious strata, the absorption trenches shall be separated by a center to center distance no less than three times the width of the trench for slopes up to 20%. The minimum horizontal separation distance shall be increased by one foot for every 10% increase in slope. In no case shall the center to center distance be less than 30 inches.
G. Slope of absorption trench bottoms.
1. Gravity distribution. The bottom of each absorption trench shall have a uniform slope not less than two inches or more than four inches per 100 feet.
2. Low pressure distribution. The bottom of each absorption trench shall be uniformly level to prevent ponding of effluent.
H. Placement of absorption trenches in the landscape.
1. The absorption trenches shall be placed on contour.
2. When the ground surface in the area over the absorption trenches is at a higher elevation than any plumbing fixture or fixtures, sewage from the plumbing fixture or fixtures shall be pumped.
I. Lateral ground water movement interceptors. Where subsurface, laterally moving water is expected to adversely affect an absorption system, a lateral ground water movement interceptor (LGMI) shall be placed upslope of the absorption area. The LGMI shall be placed perpendicular to the general slope of the land. The invert of the LGMI shall extend into, but not through, the restriction and shall extend for a distance of 10 feet on either side of the absorption area.

Table 5.4.

Area Requirements for Absorption Trenches Receiving Septic Tank Effluent.

Percolation Rate

(Minutes/Inch)

Area Required

(Ft2/100 Gals)

Area Required

(Ft2/Bedroom)

Gravity

Gravity Gravelless

Low Pressure Distribution

Gravity

Gravity Gravelless

Low Pressure Distribution

5

110

83

110

165

124

165

10

120

90

120

180

135

180

15

132

99

132

198

149

198

20

146

110

146

218

164

218

25

158

119

158

237

178

237

30

174

131

164

260

195

255

35

191

143

170

286

215

260

40

209

157

176

314

236

264

45

229

172

185

344

258

279

50

251

188

193

376

282

293

55

275

206

206

412

309

309

60

302

227

217

452

339

325

65

331

248

228

496

372

342

70

363

272

240

544

408

359

75

398

299

251

596

447

375

80

437

328

262

656

492

394

85

479

359

273

718

539

409

90

525

394

284

786

590

424

95

575

489

288

862

733

431

100

631

536

316

946

804

473

105

692

588

346

1038

882

519

110

759

645

379

1138

967

569

115

832

707

416

1248

1061

624

120

912

775

456

1368

1163

684

J. Controlled blasting. When rock or rock outcroppings are encountered during construction of absorption trenches the rock may be removed by blasting in a sequential manner from the top to remove the rock. Percolation piping and sewer lines shall be placed so that at least one foot of compacted clay soil lies beneath and on each side of the pipe where the pipe passes through the area blasted. The area blasted shall not be considered as part of the required absorption area.
K. Trenches receiving TL-2 effluent or TL-3 effluent are exempt from the increase in trench depth with slope and the soil cover requirements as found in 12VAC5-610-950 E. The following additional requirements shall apply.
1. Soil dispersal loading rates shall not exceed the values in Table 5.5.
2. The minimum vertical separation to a limiting feature shall be maintained under the entire infiltrative surface in accordance with 12VAC5-613-80.
3. The minimum soil cover, after settling, shall be six inches as measured from the finished ground surface to the uppermost limit of the dispersal media (or gravelless material) utilized in the absorption area. On sloping sites, cover shall be tied back into the existing slope to facilitate stabilization of the slope and maintenance of the site. The soil cover, with amendments as needed, shall be of a quality, character, and fertility suitable to establish a vegetative cover that is uniform and sufficiently mature to survive and inhibit erosion.
4. The minimum installation depth is equal to the sidewall of the dispersal system construction as described in 12VAC5-610-930 F (gravelless), 12VAC5-610-940, and subdivision E 1 of this section. On sloping sites, the minimum installation depth is measured on the downhill side of the absorption trench.
5. When trenches are installed at less than 12 inches from the ground surface, timed dosing shall be used to disperse the effluent.
6. For slopes up to 15% slope, there are not any soil texture group limitations for shallow placed trenches receiving TL-2 effluent or TL-3 effluent. For slopes over 15%, trench systems installed in Texture Group III and IV soils shall have a 12-inch or greater installation depth.
7. Designs supported by division-approved manufacturer design manuals may deviate from subdivisions K 4 and K 5 of this section.
8. Notwithstanding subdivisions K 1 through K 7 of this section, the minimum absorption area for a single-family residential dwelling receiving TL-2 effluent or TL-3 effluent shall be 400 square feet.

Table 5.5

Soil Absorption Area Loading Rates for Systems Receiving TL-2 Effluent or TL-3 Effluent

Percolation Rate (mpi)

TL-2 Effluent

TL-3 Effluent

Pressure Trench* Loading (gpd/ft2)

Gravity Trench* Loading (gpd/ft2)

Drip** Loading) (gpd/ft2)

Pad/Mound Loading** (gpd/ft2)

Pressure Trench* Loading (gpd/ft2)

Gravity Trench* Loading (gpd/ft2)

Drip** Loading (gpd/ft2)

Pad/Mound Loading** (gpd/ft2)

5

1.8

1.80

0.60

1.20

3.0

3.00

1.00

1.66

10

1.67

1.67

0.56

1.11

2.67

2.67

0.89

1.66

15

1.53

1.53

0.51

1.02

2.33

2.33

0.78

1.66

20

1.4

1.40

0.47

0.93

2.0

2.00

0.67

1.66

25

1.30

1.30

0.43

0.86

1.75

1.75

0.58

1.33

30

1.2

1.13

0.40

0.80

1.5

1.41

0.50

1.11

35

1.10

0.98

0.37

0.73

1.38

1.22

0.46

0.95

40

1.00

0.84

0.33

0.66

1.25

1.05

0.42

0.83

45

0.90

0.73

0.30

0.60

1.13

0.91

0.38

0.74

50

0.8

0.62

0.27

0.53

1.0

0.77

0.33

0.67

55

0.76

0.57

0.25

0.50

0.94

0.71

0.31

0.61

60

0.71

0.51

0.24

0.47

0.89

0.64

0.30

0.55

65

0.67

0.46

0.22

0.44

0.83

0.57

0.28

0.51

70

0.62

0.41

0.21

0.41

0.78

0.51

0.26

0.48

75

0.58

0.36

0.19

0.38

0.72

0.46

0.24

0.44

80

0.53

0.32

0.18

0.35

0.67

0.40

0.22

0.42

85

0.49

0.28

0.16

0.33

0.61

0.35

0.20

0.39

90

0.44

0.24

0.15

0.30

0.56

0.30

0.19

0.37

95

0.4

0.20

0.13

0.27

0.5

0.25

0.17

0.35

100

0.37

0.19

0.12

0.25

0.46

0.23

0.15

0.33

105

0.34

0.17

0.11

0.23

0.43

0.21

0.14

0.32

110

0.31

0.16

0.10

0.21

0.39

0.19

0.13

0.30

115

0.28

0.14

0.09

0.19

0.35

0.18

0.12

0.29

120

0.25

0.13

0.08

0.17

0.32

0.16

0.11

0.28

*Loading rates to trenches, whether gravity or pressure dosed, are based on the gallons per day of wastewater applied to the bottom of the trench.

**Loading rates to drip systems, pads, and mounds are based on the infiltrative surface area provided and are on an aerial basis.

12 Va. Admin. Code § 5-610-950

Derived from VR355-34-02 §4.30, eff. February 5, 1986; amended, eff. May 11, 1988; Virginia Register Volume 16, Issue 16, eff. July 1, 2000; Amended, Virginia Register Volume 32, Issue 24, eff. 8/25/2016; Amended, Virginia Register Volume 39, Issue 4, eff. 11/24/2022.

Statutory Authority: §§ 32.1-12 and 32.1-164 of the Code of Virginia.