When serious malfunctioning of an existing sewage disposal system, sewerage system or treatment works occurs, pumping and hauling may be authorized for a definite time period until the malfunctioning system can be reconstructed or repaired.
12 Va. Admin. Code § 5-610-599.1
Statutory Authority
§§ 32.1-12 and 32.1-164 of the Code of Virginia.