Construction permits are issued by the commissioner but all requests for a sewage disposal construction permit shall be directed initially to the district or local health department. For construction permits with design flows less than 1,000 gallons per day that are exempt from the license requirements for professional engineers under § 54.1-402 A 11 of the Code of Virginia, the requirement for formal plans and specifications is waived.
When high strength wastes are proposed for subsurface disposal, the treatment methodology shall comply with the requirements found in 12VAC5-580-10 et seq. of the Sewage Regulations.
The plans shall be clear and legible. They shall be drawn to a scale which will permit all necessary information to be plainly shown. The size of the plans should be no larger than 30 inches by 48 inches. Data used should be indicated. Location, when made, shall be shown on the plans. Logs of test borings shall be given either on plans or in the specifications.
Detailed plans shall consist of plan views, elevations, sections, and supplementary views that together with the specifications and general layouts provide the working information for the contract and construction of the work, including dimensions and relative elevations of structures, the location and outline form of equipment, the location and size of piping, water levels, ground elevations, and erosion control abatement facilities.
12 Va. Admin. Code § 5-610-250
Statutory Authority: §§ 32.1-12 and 32.1-164 of the Code of Virginia.