Current through Register Vol. 41, No. 8, December 2, 2024
Section 12VAC5-590-190 - PermitsA. No owner or other person may cause or allow any waterworks to be operated in the Commonwealth without a written operation permit issued by the commissioner.B. No owner or other person shall cause or allow the construction or change in the manner of transmission, storage, purification, treatment, or distribution of water (including the extension of water pipes for the distribution of water) at any waterworks in the Commonwealth without a written construction permit or a general permit for distribution mains from the commissioner.C. Construction permits may not be required for the extension of water distribution piping having a diameter of eight inches or less and serving less than 15 connections (see § 32.1-172A of the Code of Virginia).D. Individual construction permits for distribution mains are not required for waterworks that obtain a general permit (see 12VAC5-590-300 ).E. Conditions may be imposed on the issuance of any permit, and no waterworks may be constructed, modified, or operated in violation of these conditions.12 Va. Admin. Code § 5-590-190
Derived from VR355-18-003.14 § 1.20, eff. August 1, 1991; amended, Virginia Register Volume 9, Issue 17, eff. June 23, 1993; Amended, Virginia Register Volume 37, Issue 20, eff. 6/23/2021.Statutory Authority: §§ 32.1-12 and 32.1-170 of the Code of Virginia.