The basic concept when relocating utility facilities is to functionally restore the Utility's operation facilities that existed before the department constructing a department project.

(1) The department incorporates by reference 23 CFR Section 645, subpart A (12/03/2021), for utility facility relocations required by department projects. For deviations in determining whether the Utility's real property

needed for the department project should be handled as a utility relocation or right-of-way acquisition, Subsection R930-7-13(5) shall apply.

(2) If the Utility's regulatory and construction requirements can be met, the department may require utility companies to jointly occupy trenches for a department project. To the extent Utilities have valid agreements concerning the joint use of above -ground facilities, the utility companies shall cooperate with each other for the relocated joint use.
(3) If a Utility determines the existing utility facilities do not need to be replaced or are not needed to maintain its operational facilities, payment for the real property, which is needed to accommodate the construction of the department project where the utility facilities are located, shall be handled as a right-of-way acquisition.

Utah Admin. Code R930-8-6

Adopted by Utah State Bulletin Number 2015-18, effective 8/24/2015
Amended by Utah State Bulletin Number 2018-20, effective 9/28/2018
Amended by Utah State Bulletin Number 2019-16, effective 7/23/2019
Amended by Utah State Bulletin Number 2024-24, effective 12/11/2024