If it is proposed to totally remove a dam, the main concern is to return the stream and reservoir basin to their pre-dam condition. Plans should be submitted showing how the original channel is to be reclaimed, how deposited silts are to be controlled, and what methods will be used to revegetate the reservoir basin and riparian areas.
Utah Admin. Code R655-11-11A