Current through Bulletin 2024-20, October 15, 2024
Section R647-4-118 - Revisions1. In order to revise a notice of intention, an operator shall file a Notice of Intention to Revise Large Mining Operations (FORM MR-REV). This notice of intention must include all information concerning the revision that would have been required in the original notice of intention.2. A Notice of Intention to Revise Large Mining Operations (FORM MR-REV) will be processed and considered for approval by the Division in the same manner as an original notice of intention. The operator will be authorized and bound by the requirements of the existing approved notice until the revision is acted upon and any revised surety requirements are satisfied. Those portions of the approved notice of intention not subject to the revision will not be subject to review under this provision.3. Large mining operations which have a disturbed area of ten acres or less in an incorporated area of a county or twenty acres or less in an unincorporated area of a county may refile as a small mining operation. Reclaimed areas must meet full bond release requirements before they can be excluded from the disturbed acreage.Utah Admin. Code R647-4-118
Amended by Utah State Bulletin Number 2020-04, effective 2/10/2020Amended by Utah State Bulletin Number 2020-22, effective 10/29/2020