Utah Admin. Code 432-4-16

Current through Bulletin No. 2024-21, November 1, 2024
Section R432-4-16 - Drawings

Drawings must show all equipment necessary for the operation of the facility.

(1) Schematic drawings may be single line and shall contain the following information:
(a) list of applicable building codes;
(b) location of the building on the site and access to the building for public, emergency, and service vehicles;
(c) site drainage;
(d) any unusual site conditions, including easements which might affect the building or its appurtenances;
(e) relationships of departments to each other, to support facilities, and to common facilities;
(f) relationships of rooms and areas within departments;
(g) number of inpatient beds;
(h) total building area or area of additions or remodeled portions.
(2) Design development drawings, drawn to scale, shall contain the following information:
(a) room sizes;
(b) type of construction, using International Building Code classifications;
(c) site plan, showing relationship to streets and vehicle access;
(d) outline specification;
(e) location of fire walls, corridor protection, fire hydrants, and other fire protection equipment;
(f) location and size of all public utilities;
(g) types of mechanical, electrical and auxiliary systems; and
(h) provisions for the installation of equipment which requires dedicated building services, special structure or which require a major function of space.
(3) Working drawings shall include all previous submitted drawings and specifications.
(a) The licensee shall provide one copy of completed working drawings and specifications to the Department.
(b) Within 30 days after receipt of the required documentation and plan review fee, the Department will provide to the licensee and the project architect a written report of modifications required to comply with construction standards.
(c) The licensee shall submit the revised plans for review and final Department approval.

Utah Admin. Code R432-4-16